13/7/2022 10:30 - 12:00 MS6 - Strengthening of existing bridges organized by Altanzagas Ochirdorj and Tsas-Orgilmaa Makhbal |
WeM3 Room: Room VS208 Chair: Altanzagas Ochirdorj CoChair: Tsas-Orgilmaa Makhbal |
Retrofitting of prestressed concrete decks by arch steel trusses for different degradation levels
Strengthening two damaged bridges in the motorway M-410 in Madrid
Current status and maintenance system of bridges in Mongolia
The diagnosis of old railway steel bridge over the Kharaa river
Traffic barriers replacement and deck surface reparation of Las Lamas viaduct in León (Spain)
Replacement of the deck and rehabilitation of the viaduct at the link between M-40 and M-607 in Madrid (Spain)
|