Registration
  Registration Fees
  Technical Program
      All Sessions and Papers
      Search
  Technical Tours

4/9/2014    14:15 - 15:45
C. CONSTRUCTION: C2-1. Multi-supported Bridges - 1
ThA03
Room: A.2.6.1
Chair: Fabrizio Palmisano

Design and Construction of San Marcos Viaduct in the Nuevo Necaxa Avila Camacho Highway
David Arribas, José María Pérez, Pablo Bernal, José Ignacio González

Viaduct of Archidona: A 3150 m long continuous composite deck on a High Speed Railway Bridge
Francisco Millanes Mato, Enrique Bordo Bujalance, Juan Luis Mansilla Domínguez, Jesús Martín Suárez

Swivel Lowering Operation Of The Viaduct Over The River Tera
Manuel Biedma García, Francisco Javier Martínez López

Viaduct Over River Ulla: A Composite Truss In The Spanish Atlantic High Speed Railway Line
Francisco Millanes Mato, Miguel Ortega Cornejo, Luis Matute Rubio

International Centre for Numerical Methods in Engineering. Barcelona, Spain.
secretariat@IABSEMadrid2014.org / Telf. + 34 - 93 405 46 94 - Fax. + 34 - 93 205 83 47
Copyright © 2014 CIMNE, All Rights Reserved.