Registration
  Registration Fees
  Technical Program
      All Sessions and Papers
      Search
  Technical Tours

3/9/14    14:15 - 15:45
M. MAJOR PROJECTS AND INNOVATIVE STRUCTURES AND MATERIALS: M2-1. Multi-supported Bridges - 1
WeA07
Room: Aula Magna
Chair: Serge Montens

The New Wiesbaden-Schierstein Bridge – 50 Years of Steel Construction
Eberhard Pelke, Alwin Dieter

The Memaliaj Bridge
Kyriakos Stathopoulos, Pavlos Thanopoulos, Ioannis Spyropoulos, Evangelos Stathopoulos, Dimitrios Farros, Stamatios Stathopoulos

Te Matau a Pohe – the design of the Lower Hatea River Crossing, New Zealand
Martin Knight

Chilina Bridge over the Chili River in Arequipa, Peru. Balanced cantilever segmental bridge in high seismicity area.
Miguel Sacristán, Guillermo Capellán

Hernani Viaduct over the Urumea River. A cable stayed bridge for the high speed railway
Miguel Sacristán, Guillermo Capellán, Emilio Merino

International Centre for Numerical Methods in Engineering. Barcelona, Spain.
secretariat@IABSEMadrid2014.org / Telf. + 34 - 93 405 46 94 - Fax. + 34 - 93 205 83 47
Copyright © 2014 CIMNE, All Rights Reserved.